SAVED YACHTS English Language Expand Languages Menu
close

31 Regulator 2025 Boat for Sale

Change Order

ASKING PRICE: $640,000 Watch Price

Hampton, VA

49 views

Off Market

Change Order Boat | 31' Regulator 2025

Loaded with Custom options and ready to fish, Professionally rigged with all options:
  • Legendary Regulator Ride with Full Option package- partial option list below
  • Storm Gray Hull Color
  • Storm Gray Bracket, Flexi Teak on Motor Bracket
  • Storm Gray underside of T-top
  • Storm Gray Underside of Buggy Top
  • Twin 450hp Yamaha engines, 70 hrs, Transferrable Warranty until 3/1/2032
  • Cockpit freshwater engine flushing option
  • Yamaha Helm Master Plus at both stations
  • Yamaha Integrated Autopilot with Auto-Routing
  • SeaKeeper Ride Automatic Trim Tab System
  • SeaKeeper 2 Gyro Ready (cradle is mounted beneath the Helm Seat)
  • 3x Deluxe Mezzanine Tackle Center
  • Triple Axle AmeraTrail trailer with all Upgrades (in the water twice)
  • Custom Tower with full upper control station, Trailerable. Warped ladder design stays tight to the Mezz seat, (4) rod holders per side, plus 3 additional rod holders across the back, (2) stereo speakers, (2) 12 v electric reel plugs, Carbon fiber tilt steering wheel, LED Light bar, Cup Holders, Forward "Cobas Casting" rod holders. Buggy Top with Starlink antenna on top, Custom painted Black, underside Gray.
  • Barrier Coated and Bottom Painted with Custom painted Horizontal Boot Stripe
  • Thru Stem Anchor Windlass with all chain rode, freshwater anchor wash down
  • Dove Gray and White Quilted Upholstery Option
  • Upholstery Covers for Front seat, Dash and Helm Seat (Deep Gray Sunbrella)
  • Garmin HD Navigation package with (2) 8616 touch screens, (1) 8612 on tower
  • Garmin GMR Fantom 54 xHD 4kw Radar antenna
  • CHIRP Transducer
  • (3) Garmin 215 VHF Radios, one at tower
  • LED LightBar (Factory Option)
  • 2nd LED Lightbar on custom tower
  • Starlink Wifi system with inverter 
  • 110v Battery Charger (Factory Option)
  • Full Factory 3 sided Curtain Package (still in the box)
  • Factory Gaff holder option
  • Fusion Apollo 770 Stereo with Entertainment upgrade, (2) JL Audio Amps, JL Subwoofer, plus 10 JL Audio backlit LED Speakers, AM/FM/Bluetooth/Apple Airplay2/SXM Capable
  • Garmin GMR54 SiriusXM Marine Weather Receiver
  • (2) Inductive cell phone chargers
  • T-top Rocket Launcher
  • Gemlux Bluewater Outrigger Elbows with 22' Carbon Fiber collapsible outrigger poles (Professionally rigged)
  • MultiColor Underwater LED Lights
  • (8) Additional forward Cupholder/Rod Holder, Gemlux No-Bolt
  • (2) Additional aft rod holders, Gemlux No-Bolt
  • Gray Regulator helm standing pad, at main helm station
  • Gray Seadeck standing pad for Tower
  • Custom Gray Tower Upholstery with Regulator Logo Embroidered
  • Forward Sunshade with Carbon Fiber poles (Deep Gray) still in the box
  • Lazarette Bucket Holder Option
  • (2) Hose Coils (one for Freshwater, one for Raw water)
  • Forward seat cushions stored inside of the Console
  • Fresh water electric flushing toilet inside of the Console
  • Freshwater sink inside of the Console
  • 12 volt light inside of the Console
  • Plus all of the Regulator Standard features

Denison Yachting is pleased to assist you in the purchase of this vessel. This boat is centrally listed by Bluewater Yacht Sales.

Denison Yacht Sales offers the details of this yacht in good faith but can’t guarantee the accuracy of this information nor warrant the condition of this boat for sale. This yacht for sale is offered subject to prior sale, price change, or withdrawal from that yacht market without notice. She is offered as a convenience by this yacht broker to its clients and is not intended to convey direct representation of a specific yacht for sale.

INQUIRE ABOUT CHANGE ORDER

Have questions about this yacht? Fill out the form below and our team of experts will contact you soon.



Sending your Message. Please wait . . .

Your privacy is important to us. Find out how we protect it. Privacy Policy

Change Order HIGHLIGHTS

Change Order additional information

Specifications
  • Cruising Speed: 35 kn
  • Maximum Speed: 58 kn
  • Beam: 10' 3''
  • Hull Material: Fiberglass
  • Max Draft: 2' 11''
  • Fuel Tank: 1 x 300|gallon
  • Fresh Water: 1 x 35|gallon
  • Holding: 1 x 6|gallon
  • Heads: 1
Trailer Info

2025 AmeraTrail model 3032TTPB
  • 21,000 lb GVWR
  • Triple Torsion Axle Aluminum I-Beam trailer with forward Target Bunks
  • Stainless steel hardware package
  • LED Light Package
  • Electric over Hydraulic Brakes (disk brakes on all 3 axles)
  • Aluminum Wheels for all 7 tires (including spare)
  • Spare Tire mount with Spare Hub assembly
  • all tires are 235x16 ER Radial tires
  • Vee Stop bow catcher
  • Heavy Duty Jack Stand
  • PVC Guide Poles
Additional Units Included

  • 2025 AmeraTrail AS3032TTOB

Schedule a Tour of CHANGE ORDER

Contact our team to schedule a private showing.



Sending your Message. Please wait . . .

SIMILAR YACHTS FOR SALE View All

37' Invincible 2023

Kroppdustr

37' Invincible 2023

$699,900

Hobe Sound, FL, US
37' Intrepid 2024

37' Intrepid 2024

37' Intrepid 2024

$599,000

Moore Haven, FL, US
37' Midnight Express 2021

Do Better

37' Midnight Express 2021

$574,999

Hollywood, FL, US
37' Pursuit 2025

37' Pursuit 2025

37' Pursuit 2025

$599,000

US
37' Valhalla 2022

Lone Star II

37' Valhalla 2022

$520,000

Newport Beach, CA, US
37' Vela 2021

37' Vela 2021

37' Vela 2021

$549,900

Palm Beach, FL, US
37' Sea Ray 2022

37' Sea Ray 2022

37' Sea Ray 2022

$549,000

Riverhead, NY, US

OTHER Regulator YACHTS FOR SALE View All

35' Regulator 2027

2027 Regulator 35

35' Regulator 2027

$826,535

St Petersburg, FL, US
31' Regulator 2022

Filthy Animal

31' Regulator 2022

$379,000

Bradenton, FL, US
32' Regulator 2010

32' Regulator 2010

32' Regulator 2010

$199,900

Scituate, MA, US
41' Regulator 2018

41' Regulator 2018

41' Regulator 2018

$339,000

Marathon, FL, US
41' Regulator 2019

41' Regulator 2019

41' Regulator 2019

$449,000

Boston, MA, US
25' Regulator 2027

Carolina Blue 25 Cc

25' Regulator 2027

Charleston, SC, US
28' Regulator 2013

28' Regulator 2013

28' Regulator 2013

$195,000

Chester, MD, US

RELATED SERVICES

BACK TO TOP