SAVED YACHTS English Language Expand Languages Menu
close

35 Sportsman 2022 Boat for Sale

Change Order

ASKING PRICE: $308,500 Watch Price

Lantana, FL

25 views

Change Order Boat | 35' Sportsman 2022

For Sale: 2022 Sportsman 352 Center Console – Twin Yamaha 425s Low Hours and Extended Warranty


This 2022 Sportsman 352 is a top-tier offshore center console loaded with premium features and powered by twin Yamaha 425s with digital electric steering. Built for serious performance and all-day comfort, it blends innovative tech, high-end finishes, and serious fishability.


Electronics & Helm:

  • Dual Garmin GPSMAP® 8622 MFD 22" displays
  • Yamaha Command Link Plus CL7 touchscreen
  • Garmin VHF 215 radio
  • SeaStar Maximus digital switching
  • Edson 13” stainless steel steering wheel w/ power knob
  • JL Audio M6 sound system w/ 12 speakers & dual MVi DSP amps
  • Fusion® Apollo™ stereo + remote
  • Airmar B175M CHIRP transducer

Fishing & Deck Features:

  • Dual 30-gallon pressurized aquarium livewells
  • Macerated in-deck fish boxes
  • 6 flush-mounted gunwale rod holders
  • Under-gunwale rod storage & bow storage
  • High-speed livewell pickup & sea chest
  • Dual side entry doors w/ removable boarding ladder
  • Rear insulated cooler, built-in 65 qt. lounge cooler

Comfort & Layout:

  • Triple premium captain’s chairs at the helm
  • Rear-facing seat w/ sink
  • Console berth w/ sleeping for 2 adults + child, sink, shower, & porcelain head
  • Electric-actuated bow table/sun deck
  • Wraparound bow seating w/ removable backrests
  • Fiberglass hard-top with integrated lighting, tempered glass windshield & vent
  • Sileather® premium marine upholstery

Build & Utility:

  • 355-gallon fuel tank
  • 35-gallon freshwater tank w/ washdown
  • Raw water washdown
  • Trim tabs w/ LED indicators
  • Onboard battery charging system
  • Anchor windlass system w/ 400’ line
  • Total Access bilge compartment w/ Seakeeper pod
  • SportTech® vacuum infusion hull construction
  • 10-year hull warranty


This 35’ center console is turnkey and ready for anything—whether you’re heading offshore or entertaining at the sandbar. Loaded with features, meticulously kept, and built to perform. Extended engine warranty


Denison Yachting is pleased to assist you in the purchase of this vessel. This boat is centrally listed by DH Yacht Sales. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel

Denison Yacht Sales offers the details of this yacht in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of this boat for sale. A yacht buyer should instruct his yacht broker, or his boat surveyors, to investigate such details as the buyer desires validated. This yacht for sale is offered subject to prior sale, price change, or withdrawal without notice. This boat may be listed with another yacht broker.

INQUIRE ABOUT CHANGE ORDER

Have questions about this yacht? Fill out the form below and our team of experts will contact you soon.



Sending your Message. Please wait . . .

Your privacy is important to us. Find out how we protect it. Privacy Policy

Change Order HIGHLIGHTS

Change Order additional information

Specifications
  • Cruising Speed: 37.80 MPH
  • Beam: 11' 0''
  • Hull Material: Fiberglass
  • Max Draft: 2' 0''
  • Heads: 1
Fishing & Deck Features

Fishing & Deck Features:

  • Dual 30-gallon pressurized aquarium livewells
  • Macerated in-deck fish boxes
  • 6 flush-mounted gunwale rod holders
  • Under-gunwale rod storage & bow storage
  • High-speed livewell pickup & sea chest
  • Dual side entry doors w/ removable boarding ladder
  • Rear insulated cooler, built-in 65 qt. lounge cooler


Comfort And Layout

Comfort and Layout

  • Triple premium captain’s chairs at the helm
  • Rear-facing seat w/ sink
  • Console berth w/ sleeping for 2 adults + child, sink, shower, & porcelain head
  • Electric-actuated bow table/sun deck
  • Wraparound bow seating w/ removable backrests
  • Fiberglass hard-top with integrated lighting, tempered glass windshield & vent
  • Sileather® premium marine upholstery


Build & Utility

Build & Utility:

  • 355-gallon fuel tank
  • 35-gallon freshwater tank w/ washdown
  • Raw water washdown
  • Trim tabs w/ LED indicators
  • Onboard battery charging system
  • Anchor windlass system w/ 400’ line
  • Total Access bilge compartment w/ Seakeeper pod
  • SportTech® vacuum infusion hull construction
  • 10-year hull warranty


Schedule a Tour of CHANGE ORDER

Contact our team to schedule a private showing.



Sending your Message. Please wait . . .

SIMILAR YACHTS FOR SALE View All

42' Lagoon 2018

Binelle

42' Lagoon 2018

€325,000

Nassau, Bahamas
42' Invincible 2018

42' Invincible 2018

42' Invincible 2018

$329,000

Jupiter, FL, US
42' Catalina 2017

42' Catalina 2017

42' Catalina 2017

$300,000

St Petersburg, FL, US
42' Prestige 2015

R & R

42' Prestige 2015

$369,000

Seattle, WA, US
42' Tiara Yachts 2007

Mantra

42' Tiara Yachts 2007

$295,000

Harwich, MA, US
42' Grand Banks 1999

Rambler

42' Grand Banks 1999

$359,000

Branford, CT, US
42' Sabre 2004

Jezebel

42' Sabre 2004

$277,500

Rockland, ME, US

RELATED SERVICES

BACK TO TOP