SAVED YACHTS English Language Expand Languages Menu
close

37 Formula 2012 Boat for Sale

Change Order

ASKING PRICE: $200,000 Watch Price

Edgewater, NJ

0 views

Change Order Boat | 37' Formula 2012

Introducing the 2012 Formula 37 Performance Cruiser, a stunning vessel that combines elegance with performance. With an overall length of 38.4 feet, this cruiser features a robust fiberglass hull designed in a modified Vee shape, ensuring stability and smooth navigation. Powered by twin Volvo Penta IPS450 inboard engines, each delivering 330 hp, it promises exhilarating speeds, reaching a cruising speed of 32 mph and a maximum hull speed of 40 mph. The advanced POD drive system enhances maneuverability, making docking a breeze with joystick control. Inside, the cruiser offers a cozy cabin and a well-appointed head, perfect for weekend getaways. With a cruising range of 225 miles, you can explore the open waters with confidence. The 4-blade bronze propellers add to its performance, making the Formula 37 a remarkable choice for those seeking adventure on the waves. Experience luxury and power with the Change Order.

Denison Yachting is pleased to assist you in the purchase of this vessel. This boat is centrally listed by Yachting Every Day.

Denison Yacht Sales offers the details of this yacht in good faith but can’t guarantee the accuracy of this information nor warrant the condition of this boat for sale. This yacht for sale is offered subject to prior sale, price change, or withdrawal from that yacht market without notice. She is offered as a convenience by this yacht broker to its clients and is not intended to convey direct representation of a specific yacht for sale.

INQUIRE ABOUT CHANGE ORDER

Have questions about this yacht? Fill out the form below and our team of experts will contact you soon.



Sending your Message. Please wait . . .

Your privacy is important to us. Find out how we protect it. Privacy Policy

Change Order HIGHLIGHTS

Change Order additional information

Specifications
  • Cruising Speed: 27.81 kn
  • Maximum Speed: 34.76 kn
  • Beam: 12' 0''
  • Hull Material: Fiberglass
  • Max Draft: 2' 6''
  • Fuel Tank: 1 x 236|gallon
  • Fresh Water: 1 x 55|gallon
  • Holding: 1 x 57|gallon
  • Cabins: 1
  • Heads: 1
Steering System

Joystick Control
Standard Features

Exterior Features

  • NMMA Yacht Certification
  • Imron® Standard graphic & cockpit accent striping
  • Pressure-treated Perma Panel™ structural hull matrix
  • Foam-filled hull cavities
  • Chemically bonded & thru-bolted deck-to-hull joint
  • Heavy-duty PVC gunwale w/stainless steel insert
  • Integrated bow platform
  • Electric windlass w/chain counter, 200' chain, polished stainless steel anchor & hand-held remote control
  • Concealed anchor davit w/fiberglass chain locker
  • Polished remote-control searchlight
  • Stainless steel hardware & 316L stainless steel welded rails
  • Ten custom Formula logo-cast cleats
  • Stainless steel fuel fills w/integral vents
  • Three forward polished Bomar® cabin venting hatches w/integrated OceanAir® rollout SKYscreens & privacy shades
  • Six polished stainless steel portlights w/screens
  • Nonskid deck center walkway & walk-around
  • Two Sunbrella® DriFast® foam deck sunpads w/316L stainless steel rails
  • Tinted, tempered curved-glass windshield w/center walk-thru
  • Windshield wipers
  • Radar arch w/mast light
  • White air horn
  • Extended integrated swim platform w/concealed stainless steel swim ladder & pull-up cleats
  • Transom shower w/hot & cold controls
  • Molded transom trunk w/pneumatic lifts, fender storage, four fenders, storage for cockpit tables & cushion
  • 120V shorepower w/fail-safe galvanic isolator & two 30-amp cords
  • Polished stainless steel shorepower, cable TV & telephone hookups
  • Chromed city water inlet

Cockpit Features

  • Continuous molded deck & cockpit liner
  • Molded in-dash forward deck access steps w/316L stainless steel handrail
  • Burl wood-finish dash panels
  • Complete Livorsi® illuminated instrumentation, domed w/chrome bezels
  • Ritchie® compass
  • Digital depth sounder
  • Garmin® GPS navigational system w/color chartplotter
  • Livorsi chromed shifters/throttles w/in-handle outdrive trim switch
  • Dino™ tilt steering wheel w/burl insets
  • Bennett® trim tab switches & indicators
  • Fingertip outdrive trim/trailer switches
  • Auxiliary 12V outlet
  • Illuminated waterproof accessory rocker switches w/E-T-A® circuit breakers
  • Clarion waterproof dash-mounted multi-feature stereo remote control
  • Four 150W 6 1/2" marine-grade speakers w/400W amplification, polished stainless steel grilles & separate tweeters
  • iPod™/MP3 port
  • Twelve polished stainless steel drink holders
  • Cockpit/swim platform blue/white LED courtesy lights w/hand-held remote control
  • Integral 316L stainless steel safety rails
  • Weather-resistant cockpit seating featuring PreFixx® coating, Tenera® element-resistant thread, DriFast® foam & StarLite® XL synthetic marine panel construction
  • Twin command seating w/dual-position helm & companion seats
  • Port lounge w/fiberglass-lined storage
  • Aft U-shaped lounge seating w/fiberglass-lined storage, two dual-height tables & sunpad inserts
  • Disconnect switch for auxiliary 12V power
  • Molded wetbar w/integrated sink, Corian® countertop, trash container, 316L stainless steel safety rail & 120V GFCI outlet
  • Demand water system w/55-gallon capacity
  • Fire extinguisher
  • Battery parallel emergency switch
  • Custom patterned cockpit carpet
  • Pneumatic-assist transom door
  • Bimini top, front & side curtains w/easy-mount zipper connectors & extended aft cockpit enclosure in color-coordinated non-fading Sunbrella® acrylic fabric w/SeaMark™ vinyl undercoating
  • Cockpit cover in color-coordinated non-fading Sunbrella acrylic fabric w/SeaMark vinyl undercoating

Cabin Features

  • Sliding/locking cabin door
  • Cherry woodgrain-finish entry steps
  • American Cherry woodgrain-finish flooring throughout cabin
  • OceanAir Skysol pleated blind system in galley
  • Forward stateroom w/privacy curtain, centerline bed w/Sensus® memory foam mattress & storage below
  • Individual reading lights
  • Two cedar-lined forward stateroom hanging lockers w/automatic lights
  • Curved Ultraleather™ sofa seating w/dual height, high-gloss Deep Cherry wood dining tables & filler cushions
  • Custom décor pillows & draperies
  • Cabinetry in high-gloss Deep Cherry finish
  • 18,000 BTU reverse cycle air conditioner w/digital climate control
  • Phone w/cord
  • Illuminated 120V & 12V electrical panels
  • 22" LCD HDTV DVD combo player in main salon w/dockside access cord
  • Clarion® AM/FM/CD stereo w/changer control & two 450W 6"x 9" 4-way speakers
  • Six-month subscription to Sirius™ Satellite Radio digital broadcast
  • Ultraleather aft cabin lounge/double berth, filler cushion & privacy enclosure
  • Cedar-lined aft cabin hanging locker w/automatic light
  • Removable high-gloss, Deep Cherry wood cocktail table
  • Built-in WalVac® sweeper system w/easy-access wall plate
  • In-floor storage compartments
  • Complete galley in high-gloss Deep Cherry finish w/storage and hardwood dovetailed drawers, full Corian countertop, beverage center, polished stainless steel sink, concealed 2-burner electric stove w/safety shut-off switch, 120V/12V stainless steel refrigerator, Krups® coffee maker, microwave oven & concealed in-counter trash container
  • Fire extinguisher
  • Demand water system w/one-point water fill for freshwater tank and/or city water
  • 120V water heater w/heat exchanger
  • Molded private head compartment w/molded vanity, lower doors in high-gloss Deep Cherry finish, Corian counter, polished stainless steel sink w/swivel faucet, VacuFlush® unit w/holding tank & dockside pumpout, separate stall shower w/hinged acrylic door & exhaust fan
  • Two carbon monoxide detectors

Engine Features

  • Twin engine installation
  • Motorized hatch lift
  • Courtesy lighting
  • Fume detector
  • Automatic fire extinguisher
  • Thru-bolted engine mounts
  • Three marine batteries w/battery retainers
  • Disconnect switches for starting batteries
  • Battery parallel emergency switch
  • 60-amp battery charger
  • Active & passive galvanic corrosion protection systems
  • Rotary bilge blowers
  • Automatic bilge pump
  • Bilge high water alarm
  • Bennett trim tabs
  • Polished stainless steel props

Schedule a Tour of CHANGE ORDER

Contact our team to schedule a private showing.



Sending your Message. Please wait . . .

SIMILAR YACHTS FOR SALE View All

44' Regal 2008

44' Regal 2008

44' Regal 2008

$225,000

Fort Lauderdale, FL
44' Regal 2005

44' Regal 2005

44' Regal 2005

$228,000

Orillia, ON, Canada
44' Carver 2001

Devocean

44' Carver 2001

$198,000

Hampton, VA, US
44' Silverton 2002

44' Silverton 2002

44' Silverton 2002

$210,000

Old Saybrook, CT, US
44' Jeanneau 2019

Marilyn

44' Jeanneau 2019

€203,000

Olbia, IT-SS, Italy
44' Tollycraft 1990

Knot Home

44' Tollycraft 1990

$199,000

Sunshine Coast, BC, Canada
44' Carver 2004

44' Carver 2004

44' Carver 2004

$199,000

Marina del Rey, CA, US

OTHER Formula YACHTS FOR SALE View All

32' Formula 2006

ATTITUDE IS EVERYTHING

32' Formula 2006

$137,700

Cornelius, NC
33' Formula 2015

33' Formula 2015

33' Formula 2015

$146,000

Port Washington, NY, US
40' Formula 2011

Dad's Boat

40' Formula 2011

$239,000

North Myrtle Beach, SC, US
40' Formula 1999

Tony Montana

40' Formula 1999

$99,000

Miami, FL
31' Formula 2013

31' Formula 2013

31' Formula 2013

$144,900

Osage Beach, MO, US
37' Formula 2017

37' Formula 2017

37' Formula 2017

$249,000

Lavallette, NJ, US
38' Formula 2015

38' Formula 2015

38' Formula 2015

$209,000

Wilmington, NC, US

Formula YACHTS SALES REPORT

LOA (ft)
BOAT BRAND
YEAR
SOLD PRICE (USD)
SOLD DATE
DAYS ACTIVE
LOCATION
41
Formula
2001
$115,000
Aug, 23
314
Wildwood, NJ, USA
41
Formula
2011
$210,000
Aug, 23
166
Fort Lauderdale, FL, USA
40
Formula
2005
$175,000
Aug, 23
59
Waukegan, IL, USA
40
Formula
2008
$200,000
Aug, 23
89
Westbrook, CT, USA
38
Formula
2014
$325,000
Aug, 23
258
Charlevoix, MI, USA
37
Formula
2013
$220,793
Aug, 23
246
Kingston, ON, Canada
37
Formula
2016
$245,000
Aug, 23
83
Virginia Beach, VA, USA
37
Formula
2008
$160,000
Aug, 23
80
Alexandria Bay, NY, USA
37
Formula
2004
$135,000
Aug, 23
2
Charlevoix, MI, USA
35
Formula
2014
$210,000
Aug, 23
28
Wilmington, NC, USA
35
Formula
1998
$39,000
Aug, 23
172
Lake Ozark, MO, USA
34
Formula
2005
$95,000
Aug, 23
700
Oakdale, NY, USA
34
Formula
2000
$68,000
Aug, 23
207
Saint Clair Shores, MI, USA
33
Formula
2004
$58,000
Aug, 23
70
Austin, TX, USA
31
Formula
2004
$35,000
Aug, 23
39
Cleveland, OH, USA
31
Formula
2021
$290,000
Aug, 23
135
Cape Coral, FL, USA
29
Formula
2014
$115,000
Aug, 23
76
Brick, NJ, USA
29
Formula
2015
$147,000
Aug, 23
85
Decatur, IN, USA
27
Formula
2003
$53,000
Aug, 23
80
Saint Clair Shores, MI, USA
27
Formula
2005
$50,000
Aug, 23
90
Spring Lake, MI, USA
27
Formula
1999
$25,897
Aug, 23
4913
Varna, Bulgaria
27
Formula
2017
$102,000
Aug, 23
15
Colchester, VT, USA
26
Formula
2004
$33,000
Aug, 23
188
Anaheim, CA, USA
23
Formula
1973
$60,000
Aug, 23
28
Miami, FL, USA
48
Formula
2007
$350,000
Dec, 22
176
Stamford, CT, USA
48
Formula
2013
$417,000
Nov, 22
40
USA
48
Formula
2005
$295,000
Sep, 22
354
Clinton, CT, USA
48
Formula
2005
$335,000
Jul, 22
106
Peoria, AZ, USA
48
Formula
2012
$359,000
May, 22
58
Aventura, FL, USA
48
Formula
2005
$310,000
May, 22
1077
Forked River, NJ, USA
47
Formula
1998
$125,000
Jan, 22
64
San Diego, CA, USA
45
Formula
2007
$308,585
Jul, 23
189
Vancouver, BC, Canada
45
Formula
2013
$370,000
Jul, 23
135
Aventura, FL, USA
45
Formula
2009
$365,000
Jun, 23
342
North Beach, MD, USA
45
Formula
2015
$550,000
May, 23
94
Atlantic City, NJ, USA
45
Formula
2015
$525,000
Apr, 23
248
Niantic, CT, USA
45
Formula
2015
$525,000
Jan, 23
474
Clinton, CT, USA
45
Formula
2014
$440,000
Dec, 22
258
Saint Petersburg, FL, USA
45
Formula
2007
$347,000
Nov, 22
36
Westbrook, CT, USA
45
Formula
2011
$345,000
Oct, 22
391
Old Saybrook, CT, USA
45
Formula
2009
$374,500
Jul, 22
76
Annapolis, MD, USA
45
Formula
2012
$380,000
Jun, 22
36
FL, USA
45
Formula
2010
$370,000
Apr, 22
231
Grasonville, MD, USA
45
Formula
2010
$375,000
Mar, 22
36
Port St Lucie, FL, USA
45
Formula
2009
$235,000
Mar, 22
161
Fort Myers, FL, USA
45
Formula
2010
$345,000
Jan, 22
163
Grasonville, MD, USA
43
Formula
2017
$810,000
Jul, 23
112
Saugatuck, MI, USA
43
Formula
2018
$785,000
Jun, 23
201
Jupiter, FL, USA
43
Formula
2018
$860,000
Apr, 23
199
Miami, FL, USA
43
Formula
2022
$1,460,000
Dec, 22
171
Decatur, IN, USA
43
Formula
2021
$1,349,000
Dec, 22
83
Lindenhurst, NY, USA
43
Formula
2020
$1,100,000
Nov, 22
91
Lighthouse Point, FL, USA
43
Formula
2019
$965,000
Jul, 22
147
Miami Beach, FL, USA
43
Formula
2022
$1,462,028
Jul, 22
278
USA
43
Formula
2022
$1,317,323
Jun, 22
223
USA
43
Formula
2020
$1,150,000
Jun, 22
77
Jupiter, FL, USA
43
Formula
2022
$1,312,069
May, 22
244
USA
43
Formula
2019
$950,000
Apr, 22
51
USA
43
Formula
2019
$950,000
Apr, 22
48
Marco Island, FL, USA
43
Formula
2019
$970,000
Apr, 22
55
Naples, FL, USA
43
Formula
2018
$899,000
Mar, 22
199
West Palm Beach, FL, USA
43
Formula
2021
$1,144,000
Feb, 22
37
Naples, FL, USA
43
Formula
2018
$760,000
Feb, 22
178
Fort Lauderdale, FL, USA
42
Formula
2005
$175,000
Mar, 23
168
Gulf Shores, AL, USA
42
Formula
1989
$15,000
Oct, 22
171
Hampton, VA, USA
42
Formula
2004
$137,500
Jun, 22
93
Fort Lauderdale, FL, USA
41
Formula
2008
$220,000
Jul, 23
194
Hollywood, FL, USA
41
Formula
2012
$275,000
Jul, 23
34
Lake Ozark, MO, USA
41
Formula
2004
$192,500
May, 23
278
Chesapeake City, MD, USA
41
Formula
2019
$660,000
May, 23
354
Somerset, KY, USA
41
Formula
2008
$230,000
Apr, 23
133
Kingston, OK, USA
41
Formula
2013
$320,000
Apr, 23
216
Spring Lake, MI, USA
41
Formula
2017
$425,000
Mar, 23
230
Marco Island, FL, USA
41
Formula
2001
$115,000
Mar, 23
142
Centerbrook, CT, USA
41
Formula
2000
$131,200
Oct, 22
62
Fort Lauderdale, FL, USA
41
Formula
1996
$60,000
Sep, 22
423
Dana Point, CA, USA
41
Formula
2000
$115,000
Aug, 22
152
Naples, FL, USA
41
Formula
2000
$128,000
Jul, 22
50
Blades, DE, USA
41
Formula
1996
$85,000
Jun, 22
71
Osage Beach, MO, USA
41
Formula
1998
$95,000
Jun, 22
308
Muskegon, MI, USA
41
Formula
1998
$117,500
May, 22
32
Stockton, CA, USA
41
Formula
2019
$539,000
May, 22
260
Delran, NJ, USA
41
Formula
1998
$79,900
Apr, 22
45
Taylors Island, MD, USA
41
Formula
2014
$405,000
Mar, 22
770
Kingston, OK, USA
41
Formula
1999
$72,900
Jan, 22
1257
Ozona, FL, USA
40
Formula
2003
$135,000
Jul, 23
110
Rockwall, TX, USA
40
Formula
2001
$103,000
Jul, 23
30
Linn Creek, MO, USA
40
Formula
2007
$160,000
Jun, 23
263
Milford, CT, USA
40
Formula
1999
$120,000
Jun, 23
96
Saint Petersburg, FL, USA
40
Formula
2006
$200,000
May, 23
103
Lantana, FL, USA
40
Formula
2013
$345,000
May, 23
366
Sturgeon Bay, WI, USA
40
Formula
2001
$90,000
May, 23
179
Page, AZ, USA
40
Formula
2023
$1,067,958
May, 23
109
USA
40
Formula
2006
$229,000
May, 23
135
Orange Beach, AL, USA
40
Formula
2006
$226,500
Apr, 23
167
AL, USA
40
Formula
2000
$115,000
Apr, 23
77
Crownsville, MD, USA
40
Formula
2006
$160,000
Mar, 23
257
Hillsboro Beach, FL, USA
40
Formula
2005
$175,000
Mar, 23
160
Gulf Shores, AL, USA
40
Formula
2019
$655,000
Mar, 23
104
Lindenhurst, NY, USA
40
Formula
2008
$180,000
Mar, 23
281
Saint Augustine, FL, USA
40
Formula
2012
$305,000
Mar, 23
156
Osage Beach, MO, USA
40
Formula
2017
$563,900
Feb, 23
50
Miami Beach, FL, USA
40
Formula
2008
$255,000
Jan, 23
161
Kingston, OK, USA
40
Formula
2007
$180,000
Dec, 22
69
Eldon, MO, USA
40
Formula
2020
$890,000
Dec, 22
73
Bal Harbour, FL, USA
40
Formula
2001
$110,000
Dec, 22
69
Staten Island, NY, USA
40
Formula
2001
$90,000
Nov, 22
81
San Pedro, USA
40
Formula
2023
$1,188,905
Nov, 22
190
USA
40
Formula
2016
$413,500
Oct, 22
87
Decatur, IN, USA
40
Formula
2000
$135,000
Oct, 22
33
Osage Beach, MO, USA
40
Formula
2014
$389,000
Oct, 22
21
Saint Clair Shores, MI, USA
40
Formula
2021
$975,000
Sep, 22
69
Sunrise Beach, MO, USA
40
Formula
2007
$225,000
Sep, 22
86
Chesapeake City, MD, USA
40
Formula
2003
$161,500
Aug, 22
39
Discovery Bay, CA, USA
40
Formula
1999
$121,230
Aug, 22
27
Gatineau, QC, Canada
40
Formula
2004
$152,500
Aug, 22
30
Brick, NJ, USA
40
Formula
2004
$172,000
Jul, 22
121
Key Largo, FL, USA
40
Formula
2003
$142,000
Jul, 22
254
Spring Lake, MI, USA
40
Formula
2010
$359,000
Jul, 22
53
Denison, TX, USA
40
Formula
2001
$115,000
Jul, 22
267
Sister Bay, WI, USA
40
Formula
2006
$267,500
Jun, 22
56
Seattle, WA, USA
40
Formula
2000
$100,000
Jun, 22
276
Hastings, MN, USA
40
Formula
1999
$95,000
Jun, 22
343
Algonac, MI, USA
40
Formula
2006
$150,000
Jun, 22
136
Ventura, CA, USA
40
Formula
2016
$460,000
Jun, 22
147
Tampa, FL, USA
40
Formula
2005
$175,000
Jun, 22
24
East Jordan, MI, USA
40
Formula
2004
$170,000
Jun, 22
51
Harrison Township, MI, USA
40
Formula
2003
$150,000
May, 22
110
Fort Myers, FL, USA
40
Formula
2008
$225,000
May, 22
92
USA
40
Formula
2008
$225,000
May, 22
92
USA
40
Formula
2004
$199,900
May, 22
19
Deerfield Beach, FL, USA
40
Formula
2020
$575,000
May, 22
237
Suamico, WI, USA
40
Formula
2004
$135,000
May, 22
30
Fall River, MA, USA
40
Formula
2005
$145,000
May, 22
144
Cleveland, OH, USA
40
Formula
2003
$155,000
Apr, 22
336
Amityville, NY, USA
40
Formula
2015
$465,000
Apr, 22
252
Osage Beach, MO, USA
40
Formula
2005
$199,900
Apr, 22
93
Cape Coral, FL, USA
40
Formula
2011
$300,000
Apr, 22
489
San Diego, CA, USA
40
Formula
2004
$75,000
Mar, 22
104
Chicago, IL, USA
40
Formula
1999
$135,000
Mar, 22
481
Lindenhurst, NY, USA
40
Formula
2004
$90,000
Mar, 22
180
Gig Harbor, WA, USA
40
Formula
2019
$540,000
Mar, 22
230
Harsens Island, MI, USA
40
Formula
2023
$1,378,205
Mar, 22
126
USA
40
Formula
2001
$87,500
Mar, 22
81
Fort Lauderdale, FL, USA
40
Formula
2018
$475,000
Mar, 22
292
Aventura, FL, USA
40
Formula
2001
$80,000
Mar, 22
22
Austin, TX, USA
40
Formula
2001
$113,000
Feb, 22
32
USA
40
Formula
2001
$113,000
Feb, 22
36
Holland, MI, USA
40
Formula
2004
$135,000
Jan, 22
143
Webster, NY, USA
40
Formula
2018
$530,000
Jan, 22
Saint Clair Shores, MI, USA
40
Formula
2007
$190,000
Jan, 22
100
Stockton, CA, USA
40
Formula
2007
$195,000
Jan, 22
82
Stockton, CA, USA
39
Formula
2000
$110,000
Apr, 23
34
Lake Ozark, MO, USA
39
Formula
2015
$292,500
Jul, 22
Eucha, OK, USA
38
Formula
2021
$732,000
Jun, 23
276
Naples, FL, USA
38
Formula
2016
$330,000
May, 23
22
Lake Ozark, MO, USA
38
Formula
2012
$239,000
Apr, 23
203
Lake in the Hills, IL, USA
38
Formula
2019
$415,000
Apr, 23
263
Osage Beach, MO, USA
38
Formula
2013
$165,000
Apr, 23
38
Naples, FL, USA
38
Formula
2020
$625,000
Dec, 22
112
Osage Beach, MO, USA
38
Formula
2022
$950,000
Nov, 22
162
Palm Beach, FL, USA
38
Formula
2000
$90,000
Sep, 22
60
Kingston, OK, USA
38
Formula
2018
$380,000
Sep, 22
774
Osage Beach, MO, USA
38
Formula
1998
$58,000
Aug, 22
67
Rockwall, TX, USA
38
Formula
2016
$372,500
Jul, 22
85
Austin, TX, USA
38
Formula
2023
$971,877
Jul, 22
244
USA
38
Formula
2004
$155,500
Jun, 22
671
Bal Harbour, FL, USA
38
Formula
2000
$80,000
Jun, 22
9
Sherman, TX, USA
38
Formula
2008
$190,000
Jun, 22
27
Hendersonville, TN, USA
38
Formula
2021
$935,000
Jun, 22
89
Fort Lauderdale, FL, USA
38
Formula
2004
$157,500
Jun, 22
43
Bal Harbour, FL, USA
38
Formula
2020
$700,000
May, 22
223
Lindenhurst, NY, USA
38
Formula
2005
$125,000
May, 22
155
East Moriches, NY, USA
38
Formula
2007
$155,000
Apr, 22
68
Babylon, NY, USA
38
Formula
2021
$1,125,000
Apr, 22
46
USA
38
Formula
2009
$162,540
Apr, 22
315
Suamico, WI, USA
38
Formula
2022
$1,025,000
Mar, 22
27
Naples, FL, USA
38
Formula
2021
$1,125,000
Mar, 22
Fort Lauderdale, FL, USA
38
Formula
2004
$109,000
Mar, 22
138
Lake in the Hills, IL, USA
38
Formula
2004
$129,500
Mar, 22
82
Portland, OR, USA
37
Formula
2017
$345,000
Jul, 23
93
Gainesville, GA, USA
37
Formula
2005
$115,000
Jul, 23
48
Toronto, ON, Canada
37
Formula
2011
$200,000
Jul, 23
77
Key Biscayne, FL, USA
37
Formula
2013
$225,000
Jul, 23
91
Lanexa, VA, USA
37
Formula
2012
$230,000
Jul, 23
52
Sturgeon Bay, WI, USA
37
Formula
2001
$64,500
Jun, 23
121
Saint Petersburg, FL, USA
37
Formula
2005
$138,000
Jun, 23
32
East Islip, NY, USA
37
Formula
2005
$60,000
May, 23
363
Fort Lauderdale, FL, USA
37
Formula
2018
$325,000
May, 23
324
Cos Cob, CT, USA
37
Formula
2005
$142,000
May, 23
36
Grosse Ile, MI, USA
37
Formula
2008
$164,000
May, 23
235
Mattituck, NY, USA
37
Formula
2015
$255,000
May, 23
187
Fort Myers, FL, USA
37
Formula
2014
$340,000
May, 23
223
Charlevoix, MI, USA
37
Formula
2006
$130,000
May, 23
255
Stevensville, MD, USA
37
Formula
2002
$99,000
Apr, 23
87
USA
37
Formula
2002
$99,000
Apr, 23
71
Edgewater, MD, USA
37
Formula
2006
$140,000
Mar, 23
45
Massapequa, NY, USA
37
Formula
2006
$160,000
Dec, 22
22
Stockton, CA, USA
37
Formula
2003
$105,000
Dec, 22
190
Lindenhurst, NY, USA
37
Formula
2005
$140,000
Nov, 22
32
Osage Beach, MO, USA
37
Formula
2005
$129,500
Nov, 22
608
Hypoluxo, FL, USA
37
Formula
2003
$84,500
Nov, 22
74
Pompano Beach, FL, USA
37
Formula
2007
$193,500
Oct, 22
39
Cleveland, OH, USA
37
Formula
2004
$119,000
Oct, 22
77
East Islip, NY, USA
37
Formula
2004
$119,000
Oct, 22
78
East Islip, NY, USA
37
Formula
2005
$116,000
Oct, 22
98
Sausalito, CA, USA
37
Formula
2001
$70,000
Oct, 22
63
Chicago, IL, USA
37
Formula
2007
$147,500
Sep, 22
100
Eucha, OK, USA
37
Formula
2003
$100,000
Sep, 22
154
Newburyport, MA, USA
37
Formula
2008
$162,500
Sep, 22
111
Clinton, CT, USA
37
Formula
2016
$325,000
Sep, 22
261
Sturgeon Bay, WI, USA
37
Formula
2003
$79,000
Sep, 22
21
Miami, FL, USA
37
Formula
2020
$450,000
Aug, 22
108
Tonawanda, NY, USA
37
Formula
2006
$140,000
Aug, 22
198
Grasonville, MD, USA
37
Formula
2004
$117,000
Aug, 22
13
Babylon, NY, USA
37
Formula
2008
$127,000
Aug, 22
154
Fort Myers, FL, USA
37
Formula
2017
$415,000
Aug, 22
222
Pasadena, MD, USA
37
Formula
2005
$125,000
Aug, 22
77
Venice, FL, USA
37
Formula
2018
$369,000
Jul, 22
18
Saint Clair Shores, MI, USA
37
Formula
2001
$140,000
Jul, 22
21
Saint Clair Shores, MI, USA
37
Formula
2017
$415,000
Jul, 22
185
Pasadena, MD, USA
37
Formula
2005
$165,000
Jun, 22
47
Saugatuck, MI, USA
37
Formula
2018
$409,900
Jun, 22
294
Huron, OH, USA
37
Formula
2005
$125,000
May, 22
154
South Jamesport, NY, USA
37
Formula
2008
$193,000
Apr, 22
103
Lindenhurst, NY, USA
37
Formula
2004
$140,000
Apr, 22
80
Roosevelt, AZ, USA
37
Formula
2013
$294,000
Apr, 22
89
Grasonville, MD, USA
37
Formula
2009
$149,000
Mar, 22
238
Middle River, MD, USA
37
Formula
2003
$115,000
Feb, 22
104
Miami, FL, USA
37
Formula
2017
$340,000
Feb, 22
112
Fort Lauderdale, FL, USA
37
Formula
2015
$321,000
Jan, 22
139
Rock Hall, MD, USA
36
Formula
1992
$33,000
Jun, 22
24
North Fort Myers, FL, USA
36
Formula
1992
$34,000
May, 22
10
North Fort Myers, FL, USA
36
Formula
2009
$199,900
Feb, 22
840
Fort Myers, FL, USA
36
Formula
2006
$160,000
Feb, 22
78
Austin, TX, USA
35
Formula
2017
$300,000
Jul, 23
76
Norwalk, CT, USA
35
Formula
2008
$108,000
Jul, 23
157
Jersey City, NJ, USA
35
Formula
2008
$133,500
Jul, 23
7
Northport, MI, USA
35
Formula
2021
$430,000
Jul, 23
76
Lindenhurst, NY, USA
35
Formula
2022
$645,000
Jul, 23
189
Decatur, IN, USA
35
Formula
2019
$385,000
Jul, 23
147
Fort Lauderdale, FL, USA
35
Formula
2020
$409,900
Jul, 23
595
Delran, NJ, USA
35
Formula
2018
$372,500
Jun, 23
39
Osage Beach, MO, USA
35
Formula
2012
$195,000
Jun, 23
126
Austin, TX, USA
35
Formula
2021
$425,000
Jun, 23
18
Osage Beach, MO, USA
35
Formula
2021
$435,000
Jun, 23
143
Houston, TX, USA
35
Formula
2008
$102,000
Jun, 23
154
Old Lyme, CT, USA
35
Formula
2007
$95,000
Jun, 23
87
Kemah, TX, USA
35
Formula
2016
$270,000
Jun, 23
72
New Buffalo, MI, USA
35
Formula
2008
$125,000
Jun, 23
281
Pembroke, ON, Canada
35
Formula
2012
$185,000
Jun, 23
114
Warwick, RI, USA
35
Formula
2018
$265,000
Jun, 23
254
Miami, FL, USA
35
Formula
2018
$265,000
Jun, 23
253
Miami, FL, USA
35
Formula
2019
$385,000
Jun, 23
29
Decatur, IN, USA
35
Formula
2022
$450,000
May, 23
171
Key Biscayne, FL, USA
35
Formula
2006
$99,995
May, 23
3
Lake in the Hills, IL, USA
35
Formula
2017
$245,000
May, 23
197
Mamaroneck, NY, USA
35
Formula
2006
$60,982
May, 23
187
Vancouver, BC, Canada
35
Formula
2008
$80,000
May, 23
302
South Norwalk, CT, USA
35
Formula
2016
$250,000
May, 23
64
Elberta, AL, USA
35
Formula
2021
$415,000
Apr, 23
21
Osage Beach, MO, USA
35
Formula
2001
$86,000
Apr, 23
11
Lake Havasu City, AZ, USA
35
Formula
2021
$411,447
Apr, 23
305
West Vancouver, BC, Canada
35
Formula
2008
$135,000
Apr, 23
91
Hollywood, FL, USA
35
Formula
2017
$365,000
Apr, 23
87
Saint Augustine, FL, USA
35
Formula
2019
$365,000
Mar, 23
259
Marco Island, FL, USA
35
Formula
2006
$115,000
Mar, 23
153
Suamico, WI, USA
35
Formula
2016
$285,000
Mar, 23
60
Decatur, IN, USA
35
Formula
2018
$360,000
Mar, 23
158
Harsens Island, MI, USA
35
Formula
2012
$200,000
Mar, 23
69
Charlevoix, MI, USA
35
Formula
2009
$135,000
Feb, 23
236
Stockton, CA, USA
35
Formula
2018
$414,000
Feb, 23
136
Naples, FL, USA
35
Formula
2021
$492,500
Feb, 23
103
Fort Lauderdale, FL, USA
35
Formula
2013
$102,000
Feb, 23
29
Brick, NJ, USA
35
Formula
2008
$90,000
Feb, 23
62
Fort Lauderdale, FL, USA
35
Formula
2013
$150,000
Jan, 23
160
Pompano Beach, FL, USA
35
Formula
2013
$150,000
Jan, 23
174
USA
35
Formula
2010
$150,000
Jan, 23
102
Loveladies, NJ, USA
35
Formula
2015
$265,000
Jan, 23
41
Huron, OH, USA
35
Formula
2017
$320,000
Dec, 22
195
Decatur, IN, USA
35
Formula
2018
$359,000
Dec, 22
239
Lake in the Hills, IL, USA
35
Formula
2017
$265,000
Dec, 22
72
Saint Clair Shores, MI, USA
35
Formula
2020
$430,000
Dec, 22
118
West Islip, NY, USA
35
Formula
2021
$429,000
Dec, 22
42
Harsens Island, MI, USA
35
Formula
2015
$190,000
Nov, 22
65
Hyannis, MA, USA
35
Formula
2020
$449,900
Oct, 22
250
Chicago, IL, USA
35
Formula
2022
$549,000
Oct, 22
75
Bal Harbour, FL, USA
35
Formula
2015
$225,000
Oct, 22
74
Boca Raton, FL, USA
35
Formula
2017
$290,000
Oct, 22
241
Lindenhurst, NY, USA
35
Formula
2021
$460,000
Sep, 22
86
Mamaroneck, NY, USA
35
Formula
2017
$315,000
Sep, 22
16
Saint Clair Shores, MI, USA
35
Formula
2008
$110,000
Sep, 22
62
Stockton, CA, USA
35
Formula
2017
$290,000
Sep, 22
218
Lindenhurst, NY, USA
35
Formula
2015
$240,000
Sep, 22
24
Cleveland, OH, USA
35
Formula
2015
$200,000
Sep, 22
39
USA
35
Formula
2012
$204,000
Sep, 22
41
Bridgeport, CT, USA
35
Formula
2018
$403,000
Aug, 22
210
Cape Haze, FL, USA
35
Formula
2009
$135,000
Aug, 22
52
Woodbridge, VA, USA
35
Formula
2017
$385,000
Aug, 22
53
Sarasota, FL, USA
35
Formula
2017
$300,000
Aug, 22
28
Toms River, NJ, USA
35
Formula
2000
$69,799
Aug, 22
177
Toronto, ON, Canada
35
Formula
2011
$195,000
Aug, 22
18
Charlevoix, MI, USA
35
Formula
2017
$375,000
Jul, 22
82
Fort Myers, FL, USA
35
Formula
2001
$58,000
Jul, 22
51
Boca Raton, FL, USA
35
Formula
2018
$325,000
Jul, 22
42
Apollo Beach, FL, USA
35
Formula
2022
$575,000
Jul, 22
75
Fort Myers, FL, USA
35
Formula
2008
$137,500
Jul, 22
69
Grasonville, MD, USA
35
Formula
2020
$435,000
Jul, 22
40
Osage Beach, MO, USA
35
Formula
2019
$410,000
Jul, 22
96
Bal Harbour, FL, USA
35
Formula
2016
$280,000
Jun, 22
4
Saint Clair Shores, MI, USA
35
Formula
2017
$370,000
Jun, 22
47
Decatur, IN, USA
35
Formula
2016
$246,100
Jun, 22
274
Earleville, MD, USA
35
Formula
2015
$157,500
Jun, 22
45
Davie, FL, USA
35
Formula
2011
$205,000
Jun, 22
44
Miami, FL, USA
35
Formula
2014
$230,000
Jun, 22
241
Brick, NJ, USA
35
Formula
2016
$225,000
Jun, 22
181
Island Park, NY, USA
35
Formula
2004
$129,950
Jun, 22
21
Osage Beach, MO, USA
35
Formula
2013
$215,000
May, 22
100
Eucha, OK, USA
35
Formula
2008
$150,000
May, 22
81
Portland, OR, USA
35
Formula
2012
$186,000
May, 22
22
USA
35
Formula
2012
$186,000
May, 22
45
Madisonville, LA, USA
35
Formula
2016
$289,000
May, 22
62
USA
35
Formula
1989
$14,500
May, 22
Bay City, MI, USA
35
Formula
2013
$195,000
May, 22
212
Englewood, NJ, USA
35
Formula
2008
$153,000
Apr, 22
17
Osage Beach, MO, USA
35
Formula
2008
$122,000
Apr, 22
132
Cape Coral, FL, USA
35
Formula
2008
$122,000
Apr, 22
136
Cape Coral, FL, USA
35
Formula
2020
$425,000
Apr, 22
218
USA
35
Formula
2020
$425,000
Apr, 22
177
Naples, FL, USA
35
Formula
2018
$465,000
Apr, 22
150
Naples, FL, USA
35
Formula
2008
$179,900
Apr, 22
65
Port Deposit, MD, USA
35
Formula
2016
$267,500
Apr, 22
115
Cape Haze, FL, USA
35
Formula
2012
$185,000
Apr, 22
184
Westbrook, CT, USA
35
Formula
2014
$190,000
Apr, 22
250
Pompano Beach, FL, USA
35
Formula
2018
$470,000
Apr, 22
31
Sarasota, FL, USA
35
Formula
2014
$190,000
Apr, 22
252
USA
35
Formula
2018
$470,000
Apr, 22
32
Sarasota, FL, USA
35
Formula
2013
$232,000
Apr, 22
9
Saint Clair Shores, MI, USA
35
Formula
2013
$250,000
Mar, 22
163
Decatur, IN, USA
35
Formula
2019
$300,000
Mar, 22
227
Decatur, IN, USA
35
Formula
2015
$279,000
Mar, 22
243
Chicago, IL, USA
35
Formula
2018
$350,000
Mar, 22
93
Pompano Beach, FL, USA
35
Formula
2018
$350,000
Mar, 22
91
Pompano Beach, FL, USA
35
Formula
2013
$228,000
Mar, 22
24
Kingston, OK, USA
35
Formula
2009
$140,000
Feb, 22
278
Saint Petersburg, FL, USA
35
Formula
1998
$59,900
Feb, 22
81
Lake in the Hills, IL, USA
35
Formula
2019
$400,000
Feb, 22
153
Edgewater, MD, USA
35
Formula
2012
$175,000
Feb, 22
169
Pompano Beach, FL, USA
35
Formula
2021
$409,000
Feb, 22
23
Saint Clair Shores, MI, USA
35
Formula
2021
$360,000
Feb, 22
115
USA
35
Formula
2008
$113,000
Jan, 22
45
Lake Ozark, MO, USA
35
Formula
2016
$240,000
Jan, 22
52
Hampton Bays, NY, USA
35
Formula
2013
$197,500
Jan, 22
129
Kenmore, WA, USA
35
Formula
2014
$225,000
Jan, 22
96
Cumming, GA, USA
35
Formula
2018
$397,000
Jan, 22
81
Pompano Beach, FL, USA
34
Formula
2013
$200,000
Jul, 23
353
USA
34
Formula
2016
$282,750
Jul, 23
436
Virginia Beach, VA, USA
34
Formula
2001
$60,000
Jul, 23
140
Chicago, IL, USA
34
Formula
2006
$124,900
Jul, 23
28
Saint Clair Shores, MI, USA
34
Formula
1999
$105,000
Jul, 23
115
Patchogue, NY, USA
34
Formula
2008
$100,000
Jul, 23
126
Tahoe Vista, CA, USA
34
Formula
2004
$87,500
Jul, 23
278
Westbrook, CT, USA
34
Formula
2008
$155,000
Jun, 23
192
Middle River, MD, USA
34
Formula
2006
$114,000
Jun, 23
255
West River, MD, USA
34
Formula
1998
$58,778
Jun, 23
109
North Buxton, ON, Canada
34
Formula
2007
$120,000
May, 23
294
Niantic, CT, USA
34
Formula
2019
$358,000
May, 23
62
Egg Harbor City, NJ, USA
34
Formula
2000
$42,000
Apr, 23
40
Edgewood, MD, USA
34
Formula
2006
$108,740
Apr, 23
174
West Vancouver, BC, Canada
34
Formula
2006
$82,500
Mar, 23
112
Palmetto, FL, USA
34
Formula
2018
$336,000
Mar, 23
155
Portland, CT, USA
34
Formula
2006
$82,500
Mar, 23
116
Palmetto, FL, USA
34
Formula
2005
$135,685
Mar, 23
43
Suamico, WI, USA
34
Formula
2004
$110,000
Feb, 23
167
Marina Del Rey, CA, USA
34
Formula
2008
$120,000
Feb, 23
349
Miami Beach, FL, USA
34
Formula
2006
$90,000
Feb, 23
202
Hingham, MA, USA
34
Formula
2017
$302,000
Jan, 23
117
Quincy, MA, USA
34
Formula
2007
$129,000
Dec, 22
101
Deerfield Beach, FL, USA
34
Formula
2007
$100,000
Dec, 22
470
Lanoka Harbor, NJ, USA
34
Formula
2008
$145,000
Nov, 22
57
Sea Bright, NJ, USA
34
Formula
2009
$152,456
Nov, 22
144
Grand Mira North, NS, Canada
34
Formula
2001
$65,000
Nov, 22
115
Holland, MI, USA
34
Formula
2020
$390,000
Sep, 22
262
Watertown, CT, USA
34
Formula
2004
$120,000
Sep, 22
58
Essex, MD, USA
34
Formula
2004
$132,900
Aug, 22
13
Harrison Township, MI, USA
34
Formula
2015
$200,000
Aug, 22
215
USA
34
Formula
2000
$49,999
Aug, 22
390
Bear, DE, USA
34
Formula
2000
$55,000
Aug, 22
89
Stillwater, MN, USA
34
Formula
1995
$55,105
Jul, 22
350
Gananoque, ON, Canada
34
Formula
2007
$127,500
Jun, 22
69
Red Bank, NJ, USA
34
Formula
2012
$180,000
Jun, 22
993
Lindenhurst, NY, USA
34
Formula
2015
$200,000
Jun, 22
159
Fort Lauderdale, FL, USA
34
Formula
2015
$220,000
Jun, 22
182
Annapolis, MD, USA
34
Formula
2008
$165,000
Jun, 22
221
Annapolis, MD, USA
34
Formula
2007
$80,000
Jun, 22
32
USA
34
Formula
2018
$340,000
May, 22
226
Lindenhurst, NY, USA
34
Formula
1998
$25,000
May, 22
386
Macatawa, MI, USA
34
Formula
2008
$150,000
May, 22
221
Westerly, RI, USA
34
Formula
2014
$230,000
May, 22
68
Pompano Beach, FL, USA
34
Formula
2013
$219,000
May, 22
229
Macatawa, MI, USA
34
Formula
2005
$145,000
May, 22
74
Port Huron, MI, USA
34
Formula
2014
$230,000
Apr, 22
64
Pompano Beach, FL, USA
34
Formula
2014
$227,840
Apr, 22
58
Pompano Beach, FL, USA
34
Formula
2000
$60,000
Apr, 22
220
Pottsboro, TX, USA
34
Formula
2007
$90,000
Mar, 22
795
Conroe, TX, USA
34
Formula
2004
$92,000
Mar, 22
165
Newport News, VA, USA
34
Formula
2004
$128,577
Mar, 22
25
Port Moody, BC, Canada
34
Formula
2009
$199,900
Feb, 22
157
Fort Myers, FL, USA
34
Formula
2004
$90,000
Feb, 22
161
Newport News, VA, USA
34
Formula
2011
$194,750
Jan, 22
94
Lindenhurst, NY, USA
33
Formula
2016
$155,000
Jul, 23
97
Northport, NY, USA
33
Formula
2006
$88,000
Jul, 23
124
Osage Beach, MO, USA
33
Formula
1996
$46,000
Jul, 23
16
Lake Ozark, MO, USA
33
Formula
2000
$37,000
Jul, 23
122
Tuckerton, NJ, USA
33
Formula
2016
$232,000
Jul, 23
293
Easton, MD, USA
33
Formula
2003
$84,000
Jul, 23
44
Grosse Pointe Farms, MI, USA
33
Formula
2016
$240,000
Jul, 23
263
Stockton, CA, USA
33
Formula
2007
$74,000
Jul, 23
29
Austin, TX, USA
33
Formula
2020
$355,000
Jul, 23
21
Fort Lauderdale, FL, USA
33
Formula
2005
$83,000
Jul, 23
26
Osage Beach, MO, USA
33
Formula
2016
$240,000
Jun, 23
324
Charlevoix, MI, USA
33
Formula
2017
$272,500
Jun, 23
163
Suamico, WI, USA
33
Formula
2005
$86,950
Jun, 23
68
Lake Ozark, MO, USA
33
Formula
2001
$55,000
Jun, 23
316
Charlevoix, MI, USA
33
Formula
2000
$42,500
Jun, 23
15
Spring Lake, MI, USA
33
Formula
2021
$320,000
Jun, 23
294
Mooresville, NC, USA
33
Formula
2002
$48,000
May, 23
138
Harrison Township, MI, USA
33
Formula
2000
$48,000
May, 23
654
Harrison Township, MI, USA
33
Formula
2020
$322,500
May, 23
247
Osage Beach, MO, USA
33
Formula
2023
$420,000
May, 23
189
Sarasota, FL, USA
33
Formula
2005
$89,000
May, 23
29
Charlevoix, MI, USA
33
Formula
2007
$99,999
Apr, 23
31
West Islip, NY, USA
33
Formula
2003
$65,000
Mar, 23
96
Kingston, OK, USA
33
Formula
2023
$420,000
Mar, 23
20
Sarasota, FL, USA
33
Formula
1999
$54,500
Mar, 23
160
Spring Lake, MI, USA
33
Formula
2018
$299,995
Feb, 23
83
Lake in the Hills, IL, USA
33
Formula
2020
$309,000
Jan, 23
88
Saint Clair Shores, MI, USA
33
Formula
2004
$52,500
Jan, 23
121
Severna Park, MD, USA
33
Formula
2016
$259,000
Jan, 23
89
Osage Beach, MO, USA
33
Formula
2005
$31,500
Jan, 23
161
Orange Beach, AL, USA
33
Formula
2006
$85,000
Dec, 22
87
Austin, TX, USA
33
Formula
2018
$185,000
Dec, 22
301
Daytona Beach, FL, USA
33
Formula
2007
$94,000
Dec, 22
69
Westbrook, CT, USA
33
Formula
2019
$200,000
Dec, 22
75
USA
33
Formula
1998
$33,000
Dec, 22
109
Bayville, NJ, USA
33
Formula
2020
$346,000
Dec, 22
73
Decatur, IN, USA
33
Formula
2020
$425,000
Dec, 22
192
Deerfield Beach, FL, USA
33
Formula
2021
$400,000
Nov, 22
113
Island Heights, NJ, USA
33
Formula
2021
$375,000
Nov, 22
96
Decatur, IN, USA
33
Formula
2019
$360,000
Oct, 22
173
Brick, NJ, USA
33
Formula
2019
$385,000
Oct, 22
219
Coconut Grove, FL, USA
33
Formula
2006
$80,910
Oct, 22
186
Lake Ozark, MO, USA
33
Formula
2017
$262,500
Oct, 22
16
Osage Beach, MO, USA
33
Formula
2003
$71,000
Oct, 22
29
Portage, IN, USA
33
Formula
2015
$199,000
Sep, 22
128
Forked River, NJ, USA
33
Formula
2021
$355,000
Sep, 22
41
Kingston, OK, USA
33
Formula
1996
$40,000
Sep, 22
17
Eucha, OK, USA
33
Formula
2003
$50,000
Sep, 22
50
Virginia Beach, VA, USA
33
Formula
2002
$55,000
Aug, 22
53
Newport News, VA, USA
33
Formula
2005
$80,000
Aug, 22
67
Harrison Township, MI, USA
33
Formula
2003
$64,656
Aug, 22
25
Penetanguishene, ON, Canada
33
Formula
2022
$505,435
Aug, 22
277
USA
33
Formula
2003
$74,000
Aug, 22
30
Salt Lake City, UT, USA
33
Formula
2002
$55,000
Aug, 22
32
USA
33
Formula
2022
$479,000
Jul, 22
157
Mooresville, NC, USA
33
Formula
2006
$85,000
Jul, 22
22
Charlevoix, MI, USA
33
Formula
2002
$35,000
Jul, 22
37
East Hampton, NY, USA
33
Formula
2006
$90,000
Jul, 22
150
Sturgeon Bay, WI, USA
33
Formula
2005
$40,000
Jul, 22
145
Annapolis, MD, USA
33
Formula
2003
$85,000
Jul, 22
53
Stockton, CA, USA
33
Formula
1993
$36,485
Jun, 22
52
Beaulieu, Hampshire, United Kingdom
33
Formula
1999
$55,000
Jun, 22
36
Denison, TX, USA
33
Formula
2018
$315,000
Jun, 22
181
Fort Myers, FL, USA
33
Formula
2006
$37,000
Jun, 22
360
Catawba Island, OH, USA
33
Formula
2005
$95,000
Jun, 22
46
USA
33
Formula
2007
$115,000
Jun, 22
18
Grapevine, TX, USA
33
Formula
2008
$130,000
Jun, 22
41
Stockton, CA, USA
33
Formula
2004
$80,000
Jun, 22
74
Sister Bay, WI, USA
33
Formula
2004
$70,000
Jun, 22
51
Lantana, FL, USA
33
Formula
2004
$69,500
May, 22
59
Gilford, NH, USA
33
Formula
1998
$38,000
May, 22
638
Eastlake, OH, USA
33
Formula
2006
$80,000
May, 22
240
Chicago, IL, USA
33
Formula
2021
$359,000
May, 22
109
Lake Ozark, MO, USA
33
Formula
2005
$92,000
May, 22
72
Cape Coral, FL, USA
33
Formula
2017
$250,000
Apr, 22
119
Arnold, MD, USA
33
Formula
2016
$205,000
Apr, 22
76
USA
33
Formula
1999
$67,365
Apr, 22
315
Suamico, WI, USA
33
Formula
2017
$345,000
Apr, 22
167
Longboat Key, FL, USA
33
Formula
2021
$374,900
Mar, 22
94
Miami Beach, FL, USA
33
Formula
2006
$84,500
Mar, 22
64
Southampton, NY, USA
33
Formula
2006
$109,900
Mar, 22
215
Harrison Township, MI, USA
33
Formula
1997
$45,000
Mar, 22
393
Stillwater, MN, USA
33
Formula
2005
$55,000
Mar, 22
40
Peoria, AZ, USA
33
Formula
1997
$20,000
Feb, 22
70
Lake Ozark, MO, USA
33
Formula
2007
$90,000
Feb, 22
174
Massapequa Park, NY, USA
33
Formula
2006
$100,000
Feb, 22
180
Stockton, CA, USA
33
Formula
2016
$238,500
Jan, 22
43
Osage Beach, MO, USA
33
Formula
2001
$35,000
Jan, 22
514
Ludington, MI, USA
31
Formula
2006
$92,500
Jul, 23
110
Grasonville, MD, USA
31
Formula
2017
$220,000
Jul, 23
16
Charlevoix, MI, USA
31
Formula
2002
$51,798
Jul, 23
39
West Vancouver, BC, Canada
31
Formula
2018
$175,000
Jul, 23
290
Monmouth Beach, NJ, USA
31
Formula
2002
$58,000
Jun, 23
212
Toms River, NJ, USA
31
Formula
2011
$145,000
Jun, 23
67
Lake Ozark, MO, USA
31
Formula
2017
$265,000
Jun, 23
406
Eastlake, OH, USA
31
Formula
1999
$62,400
Jun, 23
224
Denison, TX, USA
31
Formula
2000
$50,000
Jun, 23
7
Cleveland, OH, USA
31
Formula
2011
$130,000
Jun, 23
25
Gravois Mills, MO, USA
31
Formula
2015
$172,500
Jun, 23
160
Chicago, IL, USA
31
Formula
2016
$174,000
Jun, 23
390
Fort Lauderdale, FL, USA
31
Formula
2021
$324,000
Jun, 23
53
Tampa, FL, USA
31
Formula
2002
$60,000
Jun, 23
275
Danvers, MA, USA
31
Formula
2018
$200,000
Jun, 23
118
Lindenhurst, NY, USA
31
Formula
2016
$173,535
Jun, 23
394
Fort Lauderdale, FL, USA
31
Formula
2005
$97,000
May, 23
707
Lindenhurst, NY, USA
31
Formula
2005
$97,000
May, 23
707
Lindenhurst, NY, USA
31
Formula
2021
$324,000
May, 23
40
Tampa, FL, USA
31
Formula
2007
$94,000
May, 23
246
Michigan City, IN, USA
31
Formula
2013
$105,555
May, 23
227
Charlevoix, MI, USA
31
Formula
2020
$267,000
May, 23
418
Coconut Grove, FL, USA
31
Formula
2008
$90,000
May, 23
312
San Diego, CA, USA
31
Formula
2008
$90,000
May, 23
42
San Diego, CA, USA
31
Formula
2011
$119,000
May, 23
342
Keswick, ON, Canada
31
Formula
1998
$45,000
May, 23
298
Lindenhurst, NY, USA
31
Formula
2015
$150,000
May, 23
45
Boca Raton, FL, USA
31
Formula
2000
$65,000
May, 23
Dana Point, CA, USA
31
Formula
2001
$49,000
May, 23
291
Sister Bay, WI, USA
31
Formula
2007
$80,000
Apr, 23
297
Cornelius, NC, USA
31
Formula
2001
$64,656
Apr, 23
236
Sarnia, ON, Canada
31
Formula
2022
$285,000
Apr, 23
41
Marco Island, FL, USA
31
Formula
2016
$160,000
Apr, 23
37
Osage Beach, MO, USA
31
Formula
2021
$265,000
Apr, 23
208
Osage Beach, MO, USA
31
Formula
2014
$191,029
Apr, 23
169
Kelowna, BC, Canada
31
Formula
2003
$66,125
Mar, 23
219
West Vancouver, BC, Canada
31
Formula
2021
$270,000
Mar, 23
128
Osage Beach, MO, USA
31
Formula
2017
$275,000
Mar, 23
282
Aventura, FL, USA
31
Formula
1999
$49,990
Mar, 23
172
Lake in the Hills, IL, USA
31
Formula
2017
$219,000
Mar, 23
Charlevoix, MI, USA
31
Formula
2013
$135,000
Feb, 23
139
Buford, GA, USA
31
Formula
2012
$127,500
Feb, 23
62
Osage Beach, MO, USA
31
Formula
2015
$140,000
Feb, 23
145
Humarock, MA, USA
31
Formula
2008
$65,000
Feb, 23
201
Pompano Beach, FL, USA
31
Formula
2014
$75,000
Jan, 23
283
Cos Cob, CT, USA
31
Formula
2018
$223,000
Jan, 23
106
Osage Beach, MO, USA
31
Formula
2007
$62,000
Dec, 22
150
Longboat Key, FL, USA
31
Formula
2007
$98,747
Nov, 22
52
Sidney, BC, Canada
31
Formula
2019
$240,000
Nov, 22
79
Delran, NJ, USA
31
Formula
2020
$263,000
Oct, 22
24
Osage Beach, MO, USA
31
Formula
2011
$120,000
Oct, 22
18
Osage Beach, MO, USA
31
Formula
2018
$220,000
Oct, 22
193
Fort Lauderdale, FL, USA
31
Formula
2008
$93,000
Oct, 22
74
Freeport, NY, USA
31
Formula
2008
$93,000
Oct, 22
18
Freeport, NY, USA
31
Formula
2002
$47,000
Oct, 22
84
Long Beach, CA, USA
31
Formula
2002
$35,000
Oct, 22
106
Long Beach, CA, USA
31
Formula
2014
$165,000
Oct, 22
46
Lexington, MI, USA
31
Formula
2018
$222,000
Oct, 22
148
Staten Island, NY, USA
31
Formula
2013
$124,800
Oct, 22
69
Lindenhurst, NY, USA
31
Formula
2003
$49,995
Sep, 22
71
Lake in the Hills, IL, USA
31
Formula
2009
$113,000
Sep, 22
591
Pottsboro, TX, USA
31
Formula
2004
$73,473
Sep, 22
41
West Vancouver, BC, Canada
31
Formula
2019
$259,000
Sep, 22
59
Charlevoix, MI, USA
31
Formula
2022
$375,000
Aug, 22
73
Naples, ME, USA
31
Formula
2005
$106,000
Aug, 22
38
Hudson, WI, USA
31
Formula
2017
$225,000
Aug, 22
80
Pompano Beach, FL, USA
31
Formula
2006
$125,000
Aug, 22
31
Stockton, CA, USA
31
Formula
2008
$79,000
Aug, 22
44
Pasadena, MD, USA
31
Formula
1999
$25,000
Aug, 22
427
League City, TX, USA
31
Formula
2005
$92,000
Aug, 22
398
Lindenhurst, NY, USA
31
Formula
2018
$250,000
Aug, 22
27
Osage Beach, MO, USA
31
Formula
2007
$125,000
Aug, 22
37
Denison, TX, USA
31
Formula
2002
$40,410
Aug, 22
62
Penetanguishene, ON, Canada
31
Formula
2009
$132,251
Aug, 22
64
Richmond, BC, Canada
31
Formula
2006
$95,514
Aug, 22
57
Kelowna, BC, Canada
31
Formula
2007
$112,000
Jul, 22
3
Alexandria Bay, NY, USA
31
Formula
2013
$175,000
Jul, 22
97
Wilmington, NC, USA
31
Formula
2019
$275,000
Jul, 22
94
Bonita Springs, FL, USA
31
Formula
2012
$157,000
Jul, 22
70
North Miami, FL, USA
31
Formula
2005
$121,500
Jul, 22
89
Placida, FL, USA
31
Formula
1997
$27,500
Jul, 22
140
Pompano Beach, FL, USA
31
Formula
2008
$65,000
Jun, 22
274
USA
31
Formula
2008
$65,000
Jun, 22
259
Warwick, RI, USA
31
Formula
2006
$90,000
Jun, 22
196
USA
31
Formula
2014
$147,000
Jun, 22
206
Brick, NJ, USA
31
Formula
2013
$150,000
Jun, 22
147
Decatur, IN, USA
31
Formula
2008
$115,000
Jun, 22
95
Miami, FL, USA
31
Formula
2012
$140,000
May, 22
122
Charleston, SC, USA
31
Formula
2016
$189,000
May, 22
41
USA
31
Formula
2017
$250,000
May, 22
223
Chicago, IL, USA
31
Formula
2018
$245,000
May, 22
49
Osage Beach, MO, USA
31
Formula
2000
$41,000
May, 22
980
Harrison, TN, USA
31
Formula
2022
$400,000
May, 22
240
Mooresville, NC, USA
31
Formula
2013
$105,000
May, 22
125
Fort Lauderdale, FL, USA
31
Formula
2009
$115,000
May, 22
35
Saint Joseph, MI, USA
31
Formula
2019
$240,000
May, 22
30
Saint Clair Shores, MI, USA
31
Formula
2004
$59,000
May, 22
385
Fernandina Beach, FL, USA
31
Formula
2000
$55,000
May, 22
39
Lake Ozark, MO, USA
31
Formula
2015
$180,000
Apr, 22
42
Glen Cove, NY, USA
31
Formula
2015
$185,000
Apr, 22
72
Eldon, MO, USA
31
Formula
2016
$169,000
Apr, 22
172
Spicewood, TX, USA
31
Formula
2015
$233,000
Apr, 22
45
Chicago, IL, USA
31
Formula
2008
$50,000
Apr, 22
77
Old Lyme, CT, USA
31
Formula
1998
$87,500
Apr, 22
67
Newport Beach, CA, USA
31
Formula
1998
$87,500
Mar, 22
64
Newport Beach, CA, USA
31
Formula
2011
$130,000
Mar, 22
79
Saint Augustine, FL, USA
31
Formula
2009
$90,000
Mar, 22
53
Fort Myers, FL, USA
31
Formula
2022
$375,000
Mar, 22
160
Mooresville, NC, USA
31
Formula
2008
$75,000
Mar, 22
23
Naples, FL, USA
31
Formula
1994
$24,000
Mar, 22
269
Deerfield Beach, FL, USA
31
Formula
1994
$24,000
Mar, 22
308
FL, USA
31
Formula
2012
$145,000
Feb, 22
323
Indian Rocks Beach, FL, USA
31
Formula
2013
$115,000
Jan, 22
43
Sanibel, FL, USA
31
Formula
2017
$190,000
Jan, 22
72
Marco Island, FL, USA
31
Formula
2017
$260,000
Jan, 22
88
Pasadena, MD, USA
31
Formula
2020
$295,000
Jan, 22
55
Decatur, IN, USA
30
Formula
1995
$48,000
Aug, 22
91
Saugatuck, MI, USA
30
Formula
1993
$36,736
Aug, 22
48
Dover Centre, ON, Canada
30
Formula
1996
$38,000
Jul, 22
74
Cambridge, MD, USA
29
Formula
2005
$64,000
Jul, 23
357
Fort Lauderdale, FL, USA
29
Formula
1989
$50,000
Jun, 23
116
Stockton, CA, USA
29
Formula
2008
$79,995
Jun, 23
18
Lake in the Hills, IL, USA
29
Formula
2013
$75,000
Jun, 23
14
Saint Augustine, FL, USA
29
Formula
2017
$180,000
Apr, 23
609
Fair Haven, MI, USA
29
Formula
2013
$90,000
Apr, 23
140
Osage Beach, MO, USA
29
Formula
2012
$55,000
Mar, 23
854
Bronx, NY, USA
29
Formula
2018
$163,000
Mar, 23
52
Delran, NJ, USA
29
Formula
2019
$183,000
Feb, 23
31
Destin, FL, USA
29
Formula
2017
$159,900
Feb, 23
68
Lake in the Hills, IL, USA
29
Formula
2023
$398,000
Jan, 23
57
Mooresville, NC, USA
29
Formula
2013
$70,000
Nov, 22
23
Tampa, FL, USA
29
Formula
2018
$172,238
Nov, 22
19
Suamico, WI, USA
29
Formula
2007
$79,995
Nov, 22
35
Lake in the Hills, IL, USA
29
Formula
2015
$127,500
Oct, 22
741
Cape Coral, FL, USA
29
Formula
2018
$189,000
Sep, 22
45
Harsens Island, MI, USA
29
Formula
1989
$28,900
Sep, 22
149
Holland, MI, USA
29
Formula
2012
$122,000
Sep, 22
35
Beach Haven, NJ, USA
29
Formula
2021
$229,000
Aug, 22
62
Mooresville, NC, USA
29
Formula
2013
$141,000
Aug, 22
26
Osage Beach, MO, USA
29
Formula
2016
$140,000
Jul, 22
119
Long Beach Township, NJ, USA
29
Formula
2012
$78,000
Jul, 22
381
Buzzards Bay, MA, USA
29
Formula
2005
$59,900
Jul, 22
30
Lake in the Hills, IL, USA
29
Formula
2017
$159,785
Jul, 22
366
Suamico, WI, USA
29
Formula
2016
$121,000
Jul, 22
228
Pompano Beach, FL, USA
29
Formula
2017
$167,000
Jun, 22
97
Boyne City, MI, USA
29
Formula
2005
$72,000
Jun, 22
215
Algonac, MI, USA
29
Formula
2018
$190,000
May, 22
34
Decatur, IN, USA
29
Formula
1990
$18,000
May, 22
93
Fort Pierce, FL, USA
29
Formula
2012
$110,000
May, 22
59
Saint Clair Shores, MI, USA
29
Formula
2012
$110,000
May, 22
65
USA
29
Formula
2021
$225,000
Apr, 22
427
Mooresville, NC, USA
29
Formula
2016
$177,214
Mar, 22
54
Suamico, WI, USA
29
Formula
2007
$67,000
Mar, 22
169
Cape Haze, FL, USA
29
Formula
2007
$55,000
Jan, 22
251
Homestead, FL, USA
29
Formula
2008
$64,000
Jan, 22
15
Branson West, MO, USA
29
Formula
2014
$110,000
Jan, 22
117
Eucha, OK, USA
28
Formula
2007
$74,000
Jul, 23
53
Decatur, IN, USA
28
Formula
2005
$46,000
Jun, 23
304
Pasadena, MD, USA
28
Formula
1999
$24,000
May, 23
288
Arnold, MD, USA
28
Formula
1998
$33,450
May, 23
37
Lakeside Marblehead, OH, USA
28
Formula
2000
$17,900
May, 23
290
Milford, CT, USA
28
Formula
2005
$45,000
May, 23
169
Essex, MD, USA
28
Formula
1999
$16,500
Apr, 23
244
Falmouth, MA, USA
28
Formula
2005
$64,000
Apr, 23
112
Spring Lake, MI, USA
28
Formula
2005
$28,000
Apr, 23
290
Norwalk, CT, USA
28
Formula
2008
$45,292
Mar, 23
31
Plymouth, Devon, United Kingdom
28
Formula
2006
$45,553
Mar, 23
206
West Vancouver, BC, Canada
28
Formula
1995
$12,999
Dec, 22
379
Mattituck, NY, USA
28
Formula
2010
$60,000
Dec, 22
293
Littleton, CO, USA
28
Formula
2004
$42,500
Nov, 22
162
Clinton, CT, USA
28
Formula
2004
$50,329
Sep, 22
77
Orillia, ON, Canada
28
Formula
2006
$35,000
Sep, 22
42
Pompano Beach, FL, USA
28
Formula
2004
$44,500
Sep, 22
39
North Miami, FL, USA
28
Formula
2005
$38,500
Sep, 22
63
Hampton Bays, NY, USA
28
Formula
1998
$37,000
Aug, 22
60
Charlevoix, MI, USA
28
Formula
2003
$44,451
Aug, 22
24
Midland, ON, Canada
28
Formula
2005
$22,274
Jul, 22
4
North Miami, FL, USA
28
Formula
2006
$68,900
Jun, 22
79
Sodus Point, NY, USA
28
Formula
2004
$55,000
Jun, 22
15
Stockton, CA, USA
28
Formula
2004
$48,000
May, 22
48
Merrick, NY, USA
28
Formula
2006
$39,999
May, 22
275
Brick, NJ, USA
28
Formula
1998
$21,000
May, 22
91
Saint Petersburg, FL, USA
28
Formula
2003
$55,000
May, 22
61
Deerfield Beach, FL, USA
28
Formula
2003
$38,500
Apr, 22
282
Cape May, NJ, USA
28
Formula
2000
$11,000
Apr, 22
3
USA
28
Formula
2000
$11,000
Apr, 22
158
Key Biscayne, FL, USA
28
Formula
2006
$63,187
Apr, 22
157
West Vancouver, BC, Canada
28
Formula
2003
$59,850
Mar, 22
5
Suamico, WI, USA
28
Formula
2008
$64,000
Mar, 22
89
Morristown, AZ, USA
28
Formula
2004
$40,000
Feb, 22
46
League City, TX, USA
28
Formula
2004
$33,999
Feb, 22
126
Fort Myers, FL, USA
28
Formula
2004
$41,000
Jan, 22
116
Mamaroneck, NY, USA
27
Formula
2011
$74,900
Jul, 23
74
Massapequa, NY, USA
27
Formula
2012
$74,995
Jul, 23
7
Lake in the Hills, IL, USA
27
Formula
2013
$70,000
Jul, 23
265
Merrick, NY, USA
27
Formula
2014
$75,000
Jun, 23
45
Carson City, NV, USA
27
Formula
2007
$79,351
May, 23
24
Port Moody, BC, Canada
27
Formula
2002
$30,000
May, 23
538
Bronx, NY, USA
27
Formula
2001
$37,500
May, 23
284
Portland, OR, USA
27
Formula
2018
$120,000
Mar, 23
327
Annapolis, MD, USA
27
Formula
2018
$120,000
Mar, 23
330
NY, USA
27
Formula
2016
$114,500
Feb, 23
380
Delran, NJ, USA
27
Formula
2005
$60,000
Dec, 22
66
Branford, CT, USA
27
Formula
2003
$32,000
Dec, 22
175
Cos Cob, CT, USA
27
Formula
2001
$48,900
Oct, 22
64
Salt Lake City, UT, USA
27
Formula
1999
$29,000
Oct, 22
60
Pittsburgh, PA, USA
27
Formula
2003
$49,000
Aug, 22
17
Eastlake, OH, USA
27
Formula
2012
$25,000
Aug, 22
374
Miami, FL, USA
27
Formula
1994
$21,000
Aug, 22
533
Prescott, WI, USA
27
Formula
1987
$16,997
Jul, 22
18
Traverse City, MI, USA
27
Formula
2004
$39,675
Jul, 22
215
Port Moody, BC, Canada
27
Formula
1999
$29,000
Jul, 22
31
Knoxville, TN, USA
27
Formula
1999
$25,800
Jul, 22
45
USA
27
Formula
2001
$42,900
Jun, 22
Harrison Township, MI, USA
27
Formula
2016
$94,000
Jun, 22
317
Miami, FL, USA
27
Formula
2003
$39,675
Jun, 22
17
Lefroy, ON, Canada
27
Formula
2000
$32,500
Jun, 22
98
Pawcatuck, CT, USA
27
Formula
2009
$85,000
Jun, 22
66
Harrison Township, MI, USA
27
Formula
2019
$145,000
Jun, 22
245
Grasonville, MD, USA
27
Formula
2002
$50,000
May, 22
319
Port Washington, WI, USA
27
Formula
2016
$93,300
May, 22
297
North Miami, FL, USA
27
Formula
2001
$30,000
May, 22
625
Cornelius, NC, USA
27
Formula
2021
$200,000
Mar, 22
413
Mooresville, NC, USA
27
Formula
2016
$95,000
Mar, 22
239
Brick, NJ, USA
27
Formula
2018
$137,500
Jan, 22
130
Eucha, OK, USA
27
Formula
2004
$49,000
Jan, 22
109
Grasonville, MD, USA
26
Formula
2008
$68,000
Jul, 23
26
Saint Joseph, MI, USA
26
Formula
2003
$23,000
Jul, 23
102
Aventura, FL, USA
26
Formula
2007
$38,500
Jun, 23
42
Woodbridge, VA, USA
26
Formula
2008
$65,000
Apr, 23
198
Harrison Township, MI, USA
26
Formula
2000
$29,500
Mar, 23
282
Austin, TX, USA
26
Formula
2007
$57,787
Mar, 23
60
Suamico, WI, USA
26
Formula
2004
$38,000
Jan, 23
42
Stockton, CA, USA
26
Formula
2006
$50,000
Oct, 22
35
Forked River, NJ, USA
26
Formula
2001
$33,500
Oct, 22
13
Harrison Township, MI, USA
26
Formula
2003
$56,000
Sep, 22
35
Cascade, IA, USA
26
Formula
2004
$38,500
Aug, 22
34
Havre De Grace, MD, USA
26
Formula
2000
$33,500
Aug, 22
22
Salt Lake City, UT, USA
26
Formula
2006
$25,000
Jul, 22
356
Shelter Island, NY, USA
26
Formula
2006
$25,000
Jul, 22
358
Shelter Island, NY, USA
26
Formula
2001
$33,000
Jun, 22
22
Forked River, NJ, USA
26
Formula
2003
$18,000
Jun, 22
203
Sarasota, FL, USA
26
Formula
2003
$18,000
Jun, 22
203
Sarasota, FL, USA
26
Formula
2003
$18,000
Jun, 22
203
Sarasota, FL, USA
26
Formula
2007
$50,000
Jun, 22
293
Amityville, NY, USA
26
Formula
2000
$39,900
May, 22
64
Lorton, VA, USA
26
Formula
1990
$24,900
May, 22
28
Holland, MI, USA
26
Formula
2000
$25,000
May, 22
35
W Barnstable, MA, USA
26
Formula
2005
$40,000
Apr, 22
65
Cape Coral, FL, USA
26
Formula
2005
$40,000
Apr, 22
59
Cape Coral, FL, USA
26
Formula
1988
$6,500
Apr, 22
200
Pittsburgh, PA, USA
25
Formula
1993
$14,000
Jun, 22
Spirit Lake, IA, USA
24
Formula
2005
$44,000
Jul, 23
15
Stockton, CA, USA
24
Formula
2008
$16,364
May, 23
365
Cleveland, OH, USA
24
Formula
2014
$55,000
Apr, 23
294
South Norwalk, CT, USA
24
Formula
2005
$47,500
Apr, 23
6
Hendersonville, TN, USA
24
Formula
2006
$41,000
Mar, 23
184
Victoria Harbour, ON, Canada
24
Formula
2007
$44,000
Feb, 23
216
Stockton, CA, USA
24
Formula
1988
$13,500
Jan, 23
130
Sagamore, MA, USA
24
Formula
2014
$87,900
Jul, 22
13
Huron, OH, USA
24
Formula
2008
$30,000
Jun, 22
48
Essex, MD, USA
24
Formula
2007
$47,000
Apr, 22
28
Osage Beach, MO, USA
24
Formula
2008
$41,500
Apr, 22
33
Marco Island, FL, USA
24
Formula
1982
$22,000
Mar, 22
69
Wilmington, NC, USA
24
Formula
2019
$96,000
Feb, 22
201
Laconia, NH, USA
23
Formula
1999
$14,500
Feb, 23
258
Salt Lake City, UT, USA
23
Formula
1996
$20,000
Aug, 22
40
Charlevoix, MI, USA
21
Formula
1985
$10,750
Sep, 22
175
Jonesport, ME, USA

RELATED SERVICES

BACK TO TOP